Skip to content

Cargo Handling & Project Cargo Coordination

Cargo handling coordinated to the nature of the goods, including packing, inspection, transfer, loading/unloading and handling equipment.

Service

Cargo handling coordinated to the characteristics of the goods, including packing, inspection, transfer, loading/unloading and arrangement of handling equipment.

For machinery, heavy equipment or out-of-gauge cargo, every request first goes through a check of specifications, weight, dimensions, route, permits and equipment availability.

Cargo Handling & Project Cargo Coordination

Service scope

  • Loading and unloading coordination.
  • Forklift or handling equipment coordinated by need and availability.
  • Coordination of heavy or out-of-gauge cargo handling.
  • Consolidation and cargo preparation before shipment.
  • Coordination of packing and cargo inspection needs.

Checks for project cargo

Before heavy or out-of-gauge cargo is processed, the following are checked first:

  • Specifications
  • Weight
  • Dimensions
  • Transport route
  • Permits
  • Equipment availability

Service flow

  1. 01

    Technical cargo data

    Specifications, weight, dimensions, lifting points and site conditions.

  2. 02

    Survey & planning

    Handling method, equipment, route and permits determined.

  3. 03

    Preparation

    Packing, consolidation and equipment coordinated with partners.

  4. 04

    Execution

    Loading/unloading and transfer carried out to plan and safety rules.

Information to prepare

  1. 01Technical specifications, weight and dimensions (drawings if available).
  2. 02Origin and destination, and site access conditions.
  3. 03Handling equipment needs (forklift, crane, etc.) if known.
  4. 04Target execution date.

Note: Equipment such as forklifts or cranes is coordinated by need and availability through partners.

FAQ

Project cargo can be discussed. Every request is checked for specifications, weight, dimensions, route, permits and equipment availability.

Handling equipment is coordinated by need and availability through our partner network.

Not all. Dangerous goods, restricted goods, heavy equipment and quarantine commodities must first be checked against the requirements.